[1] Afshar A. and Marino M.A. (1990). "Optimizing spillway capacity with uncertainty in flood estimator", Journal of Water Resources Planning and Management, 116 (l), pp. 71–84.
[2] Afshar A., Barkhordary A., and Marino M.A. (1994). "Optimizing river diversion under hydraulic and hydrologic uncertainties", Journal of Water Resources Planning and Management, 120 (1), pp. 36–47.
[3] Afshar A., Rasekh A. and Afshar M.H. (2009). "Risk-based optimization of large flood-diversion systems using genetic algorithms", Engineering Optimization, Vol. 41, No. 3, pp. 259-273.
[4] Goodarzi E., Mirzaei M., Shui L.T. and Ziaei M. (2011). "Evaluation dam overtopping risk based on univariate and bivariate flood frequency analysis". Hydrol., Earth Syst. Sci. Discuss., 8, pp. 9757–9796.
[5] Gui S., Zhang R. and Xue X. (1998). "Overtopping reliability models for river levee", Journal of Hydraulic Engineering, Vol. 124, No. 12, pp. 1227-1234.
[6] Gui S., Zhang R. and Wu J. (1998). "Simplified dynamics reliability models for hydraulic desing", Journal of Hydraulic Engineering, Vol. 124, No. 3, pp. 329-333.
[7] Hsu Y.C., Tung Y.K. and Kuo J.T. (2011). "Evaluation of dam overtopping probability induced by flood and wind", Stoch. Environ. Res. Risk Assess., 25, pp. 35-49.
[8] International Commission on Large Dams (ICOLD), (1973). Lessons from dam incidents (reduced edition). ICOLD, Paris.
[9] Kuo J.T., Yen B.C., Hsu Y.C. and Lin H.F., (2007). "Risk analysis for dam overtopping—Feitsui reservoir as a case study", Journal of Hydraulic Engineering, 133 (8), pp. 955-963
[10] Kuo J.T., Hsu Y.C., Tung Y.K., Yeh K.C. and Wu J.D., (2008). "Dam overtopping risk assessment considering inspection program", Stochastic Environmental Research and Risk Assessment, 22 (3), pp. 303-313.
[11] Kwon, H.H and Moon Y. (2006). "Improvement of overtopping risk evaluations using probabilistic concepts for existing dams", Stoch. Environ. Res. Risk Assess., 20, pp. 223-237.
[12] Lee H.L and Mays L.W. (1986). "Hydraulic uncertainties in flood levee capacity", Journal of Hydraulic Engineering, Vol. 112, No. 10, pp. 928-934.
[13] LianY. and Yen B.C. (2003). "Comparison of Risk calculation methods for a culvert", Journal of Hydraulic Engineering, Vol. 129, No. 2, pp. 140-152.
[14] Paik K. (2008). "Analytical derivation of reservoir routing and hydrological risk evaluation of detention basins", Journal of Hydrology, 352, pp. 191-201.
[15] Sharafati A., Zahabiyoun B. (2012). "Uncertainty analysis of storm pattern on Seymareh catchment", The international conference on Dam and Hydropower, Iran, Tehran
[16] Thompson K.D. Stedinger J.R. and Heath D.C. (1997). "Evaluation and presentation of dam failure and flood risks", Journal of Water Resources Planning and Management, 123 (4), pp. 216-227.
[17] USACE )1998(. HEC-1 flood hydrograph package users manual. Davis C.A: Hydrologic Engineering Centre.
[18] Yanmaz A.M. (2000). "Overtopping risk assessment in river diversion facility design", Canadian Journal of Civil Engineering 27(2). pp. 319-326
[19] Yenigun K. and Erkek C. (2007). "Reliability in dams and the effects of spillway dimensions on risk levels", Water Resources Management , Vol. 21, No. 4, pp. 747-760.
[20] Zhao B., Tung Y.K., Yeh K.C. and Yang. J.C. (1997). "Reliability analysis of hydraulic structures considering unit hydrograph uncertainty", Stochastic Hydrology and Hydraulics, 11, pp.
33-50.
[21] شرافتی، ا. ذهبیون، ب. (139۱). "تولید استوکستیک هیدروگراف سیلاب در حوضه آبریز سد جامیشان" فصلنامه علمی-پژوهشی علوم و تکنولوژی محیط زیست، دوره 14، شماره 4. صص. 63-71
شرافتی، ا. ذهبیون، ب. (139۱). "تحلیل عدم قطعیت برآورد سیلاب توسط مدل HEC-HMS در حوضه آبریز سد جامیشان"، مجله علمی-پژوهشی هیدرولیک-دوره 7، شماره یک. صص. 13-28